227 GB of a law firm's email and documents migrated in one weekend. Zero downtime. Desk-by-desk training Monday morning.

11
Accounts migrated — 227 GB total
Zero
Downtime — Google Workspace stayed live throughout
KES 110,200
Total VAT-inclusive — migration + 12-month support
227 GB of a law firm's email and documents migrated in one weekend. Zero downtime. Desk-by-desk training Monday morning. (illustration)
Situation context (illustration)
The Situation
Complete operational lockout.

Mwagambo Okonjo Advocates, a law firm operating from The Chancery on Valley Road, Nairobi, needed to migrate eleven active Google Workspace accounts — holding a combined 227 GB of email, work documents, calendars, contacts, and tasks — to a new enterprise email platform. The firm's requirement was precise: no email lost, no downtime during the transition, and all eleven staff confident on the new system before returning to work the following Monday. The migration was complicated by uneven data distribution across users, with the managing partner alone holding 68.64 GB of data. Six principal users required full collaboration platform migration — documents, calendars, contacts, and tasks — while the remaining five needed right-sized email-only plans. Some accounts contained large personal photo libraries that fell outside the migration scope and required explicit written guidance.

The Intervention
Remote reconstruction from Nairobi.

Nine One Two Limited structured the migration as a six-step sequential process designed to eliminate downtime entirely. The new platform was built and verified on the Wednesday before switch-over with no impact on the live Google Workspace environment. From Thursday, old email was copied to the new platform in the background while Google Workspace remained fully operational — no user experienced any loss of inbox access during the migration window. On Friday evening, work documents were moved for the six collaboration users. The switch-over — at which point new inbound email began routing to the new platform — was scheduled for Sunday at 8:00 PM, using the weekend's low-activity window.

Each of the eleven accounts was assigned a plan calibrated to actual usage: the managing partner received a Collaboration Professional plan at 100 GB capacity; five other principals received Collaboration Standard plans; two senior users received Mail Premium plans; and the remaining three received Mail Standard plans. The migration fee of KES 50,000 (ex-VAT) included 12 months of ongoing user support post-completion. The annual subscription for all eleven users was priced at KES 45,000 (ex-VAT), bringing the total VAT-inclusive investment to KES 110,200. The proposal carried a formal guarantee of successful migration for all eleven in-scope users.

Technical intervention (illustration)
Restored operations (illustration)
The Resolution
Resilience by design.

The migration was completed as scoped: old email was copied before switch-over, Google Workspace remained the live system throughout the background copy phase, and new inbound email began routing to the new platform from the Sunday 8:00 PM switch-over. On Monday morning, 912 engineers conducted on-site desk-by-desk training for all eleven staff, walking each user through the new system at their own workstation — ensuring the firm returned to work informed and operationally confident rather than self-discovering a new platform during active client matters. Personal files explicitly outside scope were documented with written guidance provided to affected users.

Proof path

What changed, what risk was removed, and where to go next.

What was rescued

Legal email and document data had to move without interrupting Monday operations.

What changed after

227 GB across 11 accounts moved in one weekend with zero downtime and training.

What risk was removed

Email migration disruption and user adoption risk.

What this means for your business

For a law firm, email is a primary record of client instructions and professional communications — there is no acceptable failure mode during a migration. The only way to guarantee zero data loss and zero downtime is to architect the switch-over so the old system remains live as the primary mail route until the moment you deliberately cut over. Weekend switch-overs with same-day training are not a nice-to-have; they are the only responsible migration design for a firm that cannot afford to lose a client's file.

Ready when you are

One contract.
Every technology need.

Book a free 30-minute discovery call. We map your stack, identify duplicate spend, and propose a fixed-price One Contract plan within 5 business days.